Project Description
This pedestrian bridge which is 75 meters long was erected over the promenade from the Ottawa airport to connect the Hunt Club area and the Southeast Transitway in Ottawa, Ontario. The bridge structure is composed of three steel orthotropic deck panels. The longest span measuring at 51 meters. The project involved complex manufacturing steps during assembly and soldering of components.
Project Team
Owner:City of Ottawa
Structural Engineer: Delcan, A Parsons Company
Project Manager / General Contractor: Louis W. Bray Construction
Fabricator: Canam-Ponts, division de Groupe Canam
Detailer: Canam-Ponts, division de Groupe Canam