Project Description
The Strandherd-Armstrong Bridge, located south of Ottawa, has a total length of 143 metres. The arches rise to 21 metres above the roadway and have a 125-metre opening. Steel made this exceptional structure possible. Without the structure’s relative lightness, launching would not have been possible, resulting in obvious environmental consequences. Without the strength of the material and its flexible use, such a transparent and aerial work could not have been envisioned. The environmental objectives, respect for this heritage site, and of course traffic improvement, were achieved and undoubtedly even exceeded.
Project Team
Bridge Owner: City of Ottawa
Erection/Construction Engineers, PSS Cable Specialists, Bridge Specialist Quality Assurance Engineer: Harbourside Engineering Consultants
Bridge Designer: Parsons (formerly Delcan)
General Contractor: Horseshoe Hill Construction
Steel Erector: Montacier International
Steel Fabricator: Cherubini Metal Works
Steel Detailer: Tenca Steel Detailing
PSS Cable Supplier: Freyssinet International